ACYGS PROJECTS

Preliminary Study of Workshop Equipment for Level 1 and Level 2

Find Out More

Depot

Concept

Location

Tallinn,Estonia

Client

ELRON

Operator

Project Type

Feasibility

Starting Date

2024

Imagen3-201x300

Project Description

At ACYGS, we have undertaken a preliminary design project for a warehouse and Level 2 component workshop. Through three comprehensive studies, we aimed to identify the best solution based on the available workshops, taking into account factors such as spatial layout, existing infrastructure, and potential for expansion.

Subsequently, we conducted detailed calculations of components, surfaces, and production capacity for each option. Based on these analyses, we have prepared a complete list of recommended equipment that meets technical requirements and optimizes the performance of the warehouse and component workshop.

Our approach has focused on delivering the most efficient and suitable solution to meet the client’s needs.